| Posisi | Utilisasi | Kekosongan | Status |
|---|---|---|---|
| Helper | 0.0% | 38 | Kritis |
| Foreman | 0.0% | 19 | Kritis |
| Sr HV Equipment Operator/Driver | 0.0% | 16 | Kritis |
| Safety Officer | 0.0% | 15 | Kritis |
| Sr Pipe Fitter | 0.0% | 13 | Kritis |
| Sr Materialsman | 0.0% | 12 | Kritis |
| Sr HV Equipment Operator/Driver | 0.0% | 12 | Kritis |
| Sr Pipe Fitter | 0.0% | 11 | Kritis |
| Sr Rigger | 0.0% | 11 | Kritis |
| Sr Rigger | 0.0% | 10 | Kritis |
| Foreman | 0.0% | 10 | Kritis |
| Pipe Fitter | 0.0% | 9 | Kritis |
| Welder Class B | 0.0% | 8 | Kritis |
| Inspector (QA/QC) | 0.0% | 8 | Kritis |
| Rigger | 0.0% | 8 | Kritis |
| Quantity Surveyor (QS) | 0.0% | 8 | Kritis |
| Welder Class C | 0.0% | 7 | Kritis |
| Construction Supervisor | 0.0% | 7 | Kritis |
| Welder Class B | 0.0% | 7 | Kritis |
| Document Control | 0.0% | 6 | Kritis |
| Welder Class C | 0.0% | 6 | Kritis |
| Pipe Fitter | 0.0% | 5 | Kritis |
| Rigger | 0.0% | 5 | Kritis |
| Project Controller | 0.0% | 5 | Kritis |
| HV Equipment Operator/Driver | 0.0% | 4 | Kritis |
| Materialsman | 0.0% | 3 | Kritis |
| Area Superintendent | 0.0% | 3 | Kritis |
| HES Coordinator/Specialist | 0.0% | 3 | Kritis |
| Welder Class E | 0.0% | 2 | Kritis |
| Sr Materialsman | 0.0% | 2 | Kritis |
| Welder Class E | 0.0% | 2 | Kritis |
| Administrative Coordinator | 0.0% | 2 | Kritis |
| Welder Class A | 0.0% | 2 | Kritis |
| Welder Class A | 0.0% | 2 | Kritis |
| Material Supervisor | 0.0% | 1 | Kritis |
| Materialsman | 0.0% | 1 | Kritis |
| Sr Supervisor | 0.0% | 1 | Kritis |
| Sr Construction Supervisor | 0.0% | 1 | Kritis |
| Welder Class D | 0.0% | 1 | Kritis |
| Welder Class D | 0.0% | 1 | Kritis |
| Project Manager | 0.0% | 1 | Kritis |
| HES Superintendent | 0.0% | 1 | Kritis |
| General Foreman | 0.0% | 1 | Kritis |
| QA/QC Superintendent | 0.0% | 1 | Kritis |
| Project Controls Supervisor | 0.0% | 1 | Kritis |
| QA/QC Supervisor | 0.0% | 1 | Kritis |
| Material Superintendent | 0.0% | 1 | Kritis |
| CEM Superintendent | 0.0% | 1 | Kritis |
| HV Equipment Operator/Driver | 0.1% | 1 | Kritis |
| Project Control (PC) Superintendent | 0.0% | 1 | Kritis |
| Helper | 0.1% | -7 | Kritis |
| Alat | Utilisasi |
|---|---|
| Air Compressor (Free-Air 300 cfm / 115 HP) | 0.0% |
| Generator Set 6 KVA / 10 HP | 0.0% |
| Generator Set 25 KVA / 20 KW | 0.0% |
| High Pressure Water Cleaner/Pump (3000psi/5HP) | 0.0% |
| Mobile Crane Telescopic 50 Ton (8x4) | 0.0% |
| Mobile Crane Telescopic 100 Ton | 0.0% |
| Crawler Crane Lattice Boom 50 Ton | 0.0% |
| Lifting Truck c/w Crane 5 Ton | 0.0% |
| Lifting Truck c/w Crane 8 Ton | 0.0% |
| Lifting Truck c/w Crane 15 Ton | 0.0% |
| Forklift 6 Ton | 0.0% |
| Prime Mover 6x4 & Trailer Flatbed 30 Ton | 0.0% |
| Vacuum Truck 6x4 8,000 L | 0.0% |
| Cargo Crane Truck 5 Ton | 0.0% |
| Excavator EX-006 (Belum Terdaftar di Kontrak - Rate Menunggu Konfirmasi) | 1.3% |
| Tanggal | Hari | Badge | Nama | Posisi | Total OT (Jam) |
|---|---|---|---|---|---|
| Tidak ada concern overtime saat ini. | |||||
| Tgl | Area | Concern | Tindakan | PIC | Target | Status |
|---|---|---|---|---|---|---|
| 2026-07-07 | Man Power | Kekosongan personil pada beberapa posisi Others Skill | Percepat rekrutmen & mobilisasi crew tambahan | Site Manager | 2026-07-17 | In Progress |